HOME>SERVICES>Engineering_Solution>Energy_Environmental_Engineering
The four BOT-based garbage incineration power generation projects invested and built by ENFI are located in Wuxi, Xiangyang, Harbin and Ganzhou respectively with cumulative daily waste disposal capacity of 5,600 tons. Furthermore, ENFI has completed the engineering design for over 30 garbage incineration power generation projects. Among them, 20 projects have a production capacity exceeding 1,000 tons. These projects are distributed in more than 20 cities in China, and their total daily waste disposal capacity exceeds 30,000 tons which accounts for 20% of the total garbage treatment capacity of constructed garbage treatment projects in China.
Rich engineering experience
BOT Projects
No. |
Location of construction site |
Name of project |
Capacity |
Mode |
Remarks |
1 |
Guangdong |
Shenzhen Bao’an Laohukeng Domestic Garbage Incineration Power Plant (phase II) |
3000t/d,4×750t/d, 2×30MW generator units |
Consultation |
Put into production in 2012 |
Shenzhen Baigehu Domestic Garbage Incineration Power Plant |
1200t/d,3×400t/d, 2×15MW generator units |
Consultation and design |
Under construction |
||
2 |
Hebei |
Qinhuangdao Domestic Garbage Incineration Power Plant |
1000t/d,2×500t/d, 2×9MW generator units |
Consultation and design |
Put into production in 2010 |
3 |
Hubei |
Wuhan Hanyang Guodingshan Domestic Garbage Incineration Power Plant |
1500t/d,3×500t/d, 2×20MW generator units |
Consultation and design |
Put into production in 2013 |
4 |
Jiangsu |
Yangzhou Domestic Garbage Incineration Power Plant (phase I) |
1000t/d,2×500t/d, 2×10MW generator units |
Consultation and design |
Put into production in 2010 |
Yangzhou Domestic Garbage Incineration Power Plant (phase II) |
1×610t/d, 1×12MW generator units |
Under construction |
|||
Yixing Domestic Garbage Incineration Power Plant |
500t/d, 2×250t/d, 1×9MW generator units |
Put into production in 2007 |
|||
Wuxi Huilian Domestic Garbage Incineration Power Plant |
1200t/d,3×400t/d, 2×12MW generator units |
Put into production in 2006 |
|||
Suzhou Domestic Garbage Incineration Power Plant (phase I) |
1050t/d,3×350t/d, 2×9MW generator units |
Design |
Put into production in 2006 |
||
Suzhou Domestic Garbage Incineration Power Plant (phase II) |
1000t/d,2×500t/d, 1×20MW generator units |
Consultation and design |
Put into production in 2008 |
||
5 |
Liaoning |
Dalian Domestic Garbage Incineration Power Plant |
1500t/d,3×500t/d, 2×12MW generator units |
Consultation and design |
Put into production in 2012 |
6 |
Shandong |
Jinan Domestic Garbage Incineration Power Plant |
2000t/d,4×500t/d, 2×18MW generators |
Consultation and design |
Put into production in 2011 |
Linyi Domestic Garbage Incineration Power Plant |
800t/d,2×400t/d, 1×25MW generator units |
Put into production in 2008 |
|||
7 |
Sichuan |
Chengdu Xiangfu Domestic Garbage Incineration Power Plant |
1800t/d,3×600t/d, 2×18MW generator units |
Consultation and design |
Put into production in 2012 |
Chengdu Luodai Urban Domestic Garbage Incineration Power Plant |
1200t/d,3×400t/d, 2×12MW generator units |
Put into production in 2008 |
|||
8 |
Tianjin |
Tianjin Guanzhuang Domestic Garbage Incineration Power Plant |
1000t/d, 2×500t/d,2×10MW generator units |
Consultation and design |
Under construction |
9 |
Yunnan |
Qujing Domestic Garbage Incineration Power Plant |
800t/d, 2×400t/d, 2×12MW generators |
Consultation and design |
Put into production in 2010 |
10 |
Zhejiang |
Ningbo Fenglin Domestic Garbage Incineration Power Plant |
1050t/d, 3×350t/d, 2×6.8MW generator units |
Consultation and design |
Put into production in 2001 |
Wenzhou Yongqiang Domestic Garbage Incineration Power Plant |
900t/d, 4×225t/d, 2×7.5MW generator units |
Design |
Put into production in 2003 |
||
11 |
Hainan |
Haikou Domestic Garbage Incineration Power Plant Expansion Project |
1200t/d,2×600t/d, 2×12MW generator units |
Design |
Under construction |
12 |
Shanxi |
Shanxi Jincheng Domestic Garbage Incineration Power Plant |
500t/d,9MW generator units |
Consultation and design |
Under construction |
Successful BOT projects